How to prolong the service life of non negative pressure water supply equipment

2017/2/28??????view:

How to prolong the service life of non negative pressure water supply equipment


    As everyone knows, the water pump is used as the core component of non negative pressure water supply equipment, is the key to non negative pressure water supply equipment can operate normally, in addition to the principle of centrifugal pump related knowledge, we have more important is how to conduct the related maintenance of our water pump, to prolong the service life of the water pump non negative pressure water supply equipment, from below the following details should pay attention to what matters to prolong the service life of the water pump.
Preparation of non negative pressure water supply equipment before starting:
1, test motor steering is correct, from the top of the motor to the pump as a clockwise rotation, the test time should be short so as to avoid mechanical seal dry wear.
2, open the exhaust valve to fill the entire pump body, to be closed after the exhaust valve.
3, check each part is normal.
4, with the hand disc pump to make the lubricating liquid into the mechanical seal face.
5, the high temperature type should first run preheating, heating rate of 50 C / h, in order to ensure that each department is heated evenly.
Non negative pressure water supply equipment start:
1, fully open inlet valve.
2. Close the valve.
3, start motor, observe whether the pump is running correctly.
4, adjusting the outlet valve opening to the desired condition, such as the user is equipped with flow or pressure meter at the outlet of the pump, it should adjust the outlet valve opening in the pump performance parameter table rated point operation, if the user is not installed in the pump outlet flow or pressure meter, it should adjust the outlet valve opening; the motor current measuring pump, the motor runs in the rated current, otherwise it will cause the pump overload operation (i.e. current operation, to make the motor burned out) adjustable outlet valve opening is large and small and pipeline related conditions.
5, check the seal leakage, normal mechanical seal leakage should be less than 3 drops per minute.
6, check the motor, bearing temperature rise at less than 70 DEG C.
Non negative pressure water supply equipment shutdown:
1, high temperature before cooling, the cooling rate is not higher than 10 deg / min, the temperature is lowered to below 80 DEG C, to stop.
2. Close the valve.
3, stop motor.
4, close the inlet and outlet valve.
5, such as long-term shutdown, the pump should be put into the liquid.
Through the above several operations related to the maintenance, I believe the pump service life will be greatly extended, better play its due function.







Name: *
tel: *
Question: *
leave your message
圖片看不清?點擊重新得到驗證碼
主站蜘蛛池模板: 日韩不卡1卡2卡三卡2021免费| 午夜精品久久久久久久久久久久| 亚洲国产品综合人成综合网站| 97欧美精品系列一区二区| 性一交一乱一乱一视频| 粉嫩极品美女国产在线观看| 国产在线亚州精品内射| 久久66热人妻偷产精品| 国产无遮挡a片又黄又爽漫画| 国产日韩欧美| 变态sm天堂无码专区| 四虎影视在线观看2413| 国产精品免费麻豆入口| 未成满十八禁止免费网站1 | 亚洲日本va一区二区三区| 狠狠人妻久久久久久综合| 欧美乱人伦视频在线| 国产女人高潮嗷嗷嗷叫| 亚洲成αv人片在线观看| 欧美牲交40_50a欧美牲交aⅴ| 婷婷色综合aⅴ视频| 18禁无码永久免费无限制网站 | 丰满少妇被猛烈进入无码| 亚洲www永久成人网站| 久久亚洲精品中文字幕| 久久本道综合久久伊人| 一本之道中文日本高清| 亚洲国产精品无码久久电影| 国产肥白大熟妇bbbb| 国产激情无码视频在线播放性色| 国产日韩精品中文字无码| 九九99久久精品综合| 加勒比中文字幕无码一区| 色婷婷亚洲婷婷五月| 国产三级农村妇女在线| 日日摸日日碰人妻无码老牲| 激情内射亚洲一区二区三区| 中文日产无乱码av在线观| av无码国产在线观看岛国| 免费国产成人午夜福利电影| 四虎永久地址www成人久久|